A partial update
A new vanity, fixtures, lighting, or a tub replaced by a walk-in shower, with the rest of the room kept as it is.
IllustrationIn short
A small bathroom can cost more to remodel than a large one. What decides it is not the square footage. It is how much plumbing moves, how much of the room is tiled, and what the shower is.
We don’t publish prices, because no two bathrooms are the same. This is what changes the number, so that an estimate makes sense when you read one.
Scope
A new vanity, fixtures, lighting, or a tub replaced by a walk-in shower, with the rest of the room kept as it is.
The room is taken back to the walls and rebuilt, with the toilet, shower, and vanity in their existing positions.
The shower grows, a wall moves, or fixtures change places. Every fixture that moves takes its drain and supply lines with it.
The shower
A tiled shower is built in place: the floor is formed and sloped, a waterproof system goes in behind the tile, and then the tile, glass, and fixtures follow. It is usually the most labor-intensive part of a bathroom.
Its size, the amount of glass, and details such as a bench, a niche, or a second shower head all add to it. A level, curbless entry adds concrete work on a slab.
Tile
Two choices drive the tile cost: how much of the room is tiled, and how the tile is laid. Tile to the ceiling costs more than tile to shoulder height. A herringbone or mosaic takes longer to set than a large tile in a straight pattern.
The price of the tile itself is often the smaller part. A modest tile in a careful layout can cost more to install than an expensive one laid simply.
Hidden work
Moving a shower drain or a toilet in a home on a concrete slab means cutting and patching concrete. Keeping them where they are avoids it.
With the walls open, original piping can be seen for the first time in decades. Replacing it then is practical, and it is a cost that is hard to know before demolition.
A fan that vents outdoors, or a duct that has to be extended to get there, is a small cost that protects everything else.
Bathroom ventilationA leaking tub or shower can leave damage behind the tile that only shows once it is removed.
The rest
A vanity ranges from a stock cabinet to one built for the room, and its top is priced like any countertop. Faucets, shower valves, and lighting vary widely, and are easy places to spend more or less.
A remodel that alters the plumbing needs a permit. In a condominium, association approval, water shut-offs, and working hours add coordination.
A real number
A useful estimate comes from someone seeing the bathroom: where the plumbing sits, what the floor is, how the room is used.
Collaborative Construction begins with a free, no-pressure consultation at your home, followed by a detailed proposal you review with us. We also offer financing options, which you can ask about during your consultation.
Good to know
It depends on the scope: whether fixtures move, how the shower is built, how much of the room is tiled, and what is found behind the walls. Published averages cannot account for those. We don’t publish prices. Every project starts with a free on-site estimate and a detailed proposal for your bathroom.
Usually the shower. A tiled shower is built in place, with a sloped floor, a waterproof system, tile, and glass, which makes it the most labor-intensive part of the room.
Not always. A small bathroom has the same fixtures and the same trades as a large one. What changes the cost most is whether the plumbing moves and how much tile work there is, not the square footage.
Keep reading
This article is general guidance for homeowners. Every home is different, and what suits yours is something to look at in person.